New B. Braun Wave Value Factory
As general planner for the new B. Braun value factory at the site Melsungen, Dr. Schönheit + Partner realized another future factory in Germany. Through the integrated factory planning from inside out, innovative production methods and processes were transferred into the structure and shape of an economic, flexible, and adaptable plant. The production plant for dialysis machines and infusion pumps also includes administrative areas and a new training center. In March 2009 the shell phase started. In the "Avitum Village", which was built in front of the B. Braun City of Industry, marketplaces function as key locations and optimize the interface between man and material.
For more information, click here.
Facts:
Total investment 82 million euros,
43,400 m² building space,
completed in mid 2011.